Case Studies

At Marldon UK we are passionate about what we do.  Providing innovative flooring solutions and support for many wood floor build problems. Take a look at just a small selection of our case studies below where our passion for delivering quality solutions that overcome challenges, save time and boast strong green credentials is displayed.

Summary

Royal Arsenal Riverside is an exciting new development that will offer remarkable apartments with views overlooking the River Thames and towards Canary Wharf. Marldon’s bespoke subfloor system delivers high specification sound reduction and dependable damp proofing within a tighter than anticipated budget.

Summary

In the heart of Westminster, surrounded by the capital’s most important buildings, Great Minster House is one of London’s most perfectly placed luxury apartment developments. Marldon UK saved over a month off the build time by providing a damp proof flooring solution that did not require the concrete to be fully set.

Summary

The 87 storeys of The Shard tower over 300 metres above the city of London, creating an iconic addition to the famous skyline. Marldon UK provided a sub-floor solution that allowed for flexible movement of the wooden floor in response to heating and air conditioning.

Summary

One Tower Bridge is one of London’s most sought after luxury developments, set right in the heart of the city beside the Thames. Marldon UK provided an effective sound dampening solution for these prestigious apartments, which still allowed the underfloor heating to work efficiently and effectively.

Summary

The Canadian High Commission, at Canada House in Trafalgar Square, is a key diplomatic building providing a wide range of services. Marldon UK provided an acoustic solution with a low profile, which solved sound transference issues without creating new problems with floor height.